Home/Projects

Rooms we have built, sized the way we would size yours

The figures below are project facts: tonnage, throughput, temperature and equipment. Client names stay off the page until they give written permission

Slaughter and processing

Raw material store

25,000 t at −18°C

12,000 m², four rooms, with two 3 t/h spiral freezers, two 2 t units and a 2,000 m² finished-goods store. Six 10 m³ pump-barrel packages and parallel screw units.

Processing plant

40,000 t per year

Blast freezing, frozen storage, electrical distribution and control supplied as one package — scheduled around an operating factory, not a greenfield site.

Poultry

8,000 t chilled + 180 t/day

Around 200,000 birds per day, with cooking and further-processing lines. Distribution of scroll condensing units across rooms rather than one central plant.

Broiler line

24 million birds per year

30 t/12 h blast capacity, a spiral freezer at 1.2 t/h and a 3,000 m² processing room held at 12–15°C.

Export-grade

Supermarket and export supply

A plant supplying supermarket chains and export markets in Japan and Korea took 52 scroll condensing units in a single delivery.

Halal

Certified poultry processor

A halal-certified poultry operation runs our scroll units across its rooms — hygiene and washdown requirements drove the equipment choice.

Cold chain and low-temperature storage

Fruit

−20 to −25°C holding

120 t-class rooms for a fruit cooperative, with a 900 kW evaporative condenser and parallel screw units sized for summer design conditions.

Grain

1,500 m² rural project

Sweet corn cold storage delivered as a complete room set — panels, units, coolers and control — for a county-level agricultural programme.

Distribution

Multi-temperature

Chilled, frozen and low-temperature processing rooms in one building, sharing a plant room and a single control system.

Four things we insist on

1

A room list before a price

Every project starts with rooms, temperatures and daily tonnage written down. Otherwise the quote is a guess with a number on it.

2

Defrost and drainage decided early

Most call-backs after handover trace back to defrost method, floor insulation or drainage slope — decisions made at drawing stage, not on site.

3

Commissioning documented

Pull-down curve, set points, alarm list and a short handover session with the people who will run the room.

4

Spares identified before handover

The consumables and critical spares are listed and quoted with the room, not discovered after the first breakdown.

Project references and, where permitted, contactable customers are available on request during a serious enquiry.

Ask for a reference in your sector

Tell us the product and the scale — we will point to the closest project we have done.

Request a quote [email protected] WhatsApp QR codeScan to chat