A cold room project changes country by country — not in the equipment, but in the duty rate, the conformity mark, the port and the paperwork. The panel and the unit are the same. For example, a preferential duty rate usually requires a certificate of origin, and some markets ask for conformity marking before the unit clears customs. Each market page below covers only those local rules.
We work with installation and distribution partners worldwide. Southeast Asia, the Middle East and Africa are where most of our export projects sit today, but the offer is open to any market where there is demand — what matters is a team that can install and service what we build.
| What you get | What we ask |
|---|---|
| Factory pricing | An installation team, or a partner you already work with |
| Drawings and documentation in English | A defined territory you can actually cover |
| Technical training at Qihe or on site | A service capability for commissioning and warranty work |
| Spare parts and unit support | Regular communication on live projects, not just enquiries |
Write to [email protected] with your company profile, the territory you cover and the projects you have delivered.
The equipment is largely the same. What changes is the paperwork, the certification and how the room gets installed.
| Factor | Why it changes the project |
|---|---|
| Import duty and origin rules | Decides whether a preferential agreement applies, and therefore whether a certificate of origin has to be issued before shipment |
| Product certification | Some markets require conformity marking or energy labelling before the unit clears customs — that has to be arranged at order stage, not at the port |
| Port and container limits | Panel length is set by container space, not by production. That single constraint decides how many joints a room will have |
| Installation route | Supervision under a business visa, or a local contractor working from our drawings. It changes the drawing package and the schedule |
| Local power supply | Voltage, phase and frequency decide the control panel and the motor protection before anything is built |
Each market page states what applies there. Where a rule depends on the product's HS code or changes by year, we confirm it against the current regulation rather than quoting a figure from memory.